Mihyar

My role
Requirements and Concept Development
Period
Concept specification · 13 September 2025

For a side project, I specified a thobe-tailoring platform connecting a customer portal with the branch and tailor. The document follows an order from fitting to collection and includes a sitemap, wireframes and data model. My contribution was the requirements and concept.

Platform requirementsPDF

The previews of pages 5 and 18 include editorial translations of the English examples where Arabic characters are missing. The original specification preserves both pages as received.

Platform requirements · Reviews and audit logs · Page 12 of 18

Reviews and audit logs

The work in detail

  • I mapped three interfaces for discovering the service, configuring a thobe and managing orders internally.Platform requirements · p. 4
  • I linked measurements to the customer and order so a fitting at the branch or at home could inform production.Platform requirements · p. 7
  • I specified both sides of the order. The customer tracks progress while the team records cutting, sewing, fitting, quality checks and handover.Platform requirements · p. 13
  • I phased the proposed build around orders, inventory and the customer portal first, followed by engagement tools, with AI and augmented reality reserved for a later phase.Platform requirements · p. 17